Greymouth Water Treatment Plant

Client: Grey District Council
Completion Date: September 2015
Value: $1.41M

DSC04052.jpg

The Project

Provided a Design/Build solution to Grey District Council for the following:

  • New Duty Standby UV Disinfection System

  • New on-site Water Storage Reservoir

  • New Lime Dosing System including a 90m3 lime storage silo and associated dosing equipment

  • Upgrade to the existing Chlorine Dosing System

DSC04382.JPG

Key Points

The upgrade provides Greymouth with a robust drinking water supply providing 3 Log Credit Treatment under the Drinking Water Standards of NZ (DWSNZ).

Key to the project was maintaining water supply to Greymouth (pop. 10k) during the construction works phase of the project.

Following the successful outcome of the project, Process Flow have secured repeat business with Grey District Council and elsewhere on the West Coast.